Some of our major projects, past and present, include:

 

US Forest Service: Aquatic Fish Baffle
 

Funded by the American Recovery and Reinvestment Act in Summer 2010, CCCI installed an arch culvert in Chittenden Brook in Green Mountain National Forest. This created an aquatic fish baffle to create an area where the fish can swim upstream to spawn.
 

Addison County Supervisory Union: Middlebury Union High School Re-paving
 

CCC reconstructed the entrance and circle at Middlebury Union High School, including the sidewalk, drainage, curbing and pavement in the summer of 2010. Updates included the installation of heated sidewalks to prevent ice buildup.

 

Addison County Supervisory Union: Middlebury Union Middle School Walkway
 

’x 650’ gravel walkway on school grounds. In the summer of 2010 CCC was contracted to update the walkway with smooth hot top.
 

Middlebury Volunteer Ambulance Association: New Crew Station
 

Champlain Construction played a major part in getting the MVAA into their brand new, multi-million dollar facility. CCC was responsible for all the groundwork and site work, including water, sewer, pump station oil separator, drainage, parking lot, storm water retention pond and the new helicopter pad. The building is almost complete at present time and will have sleeping quarters and all the amenities for a full ambulance crew to remain there at all times.
 

US Department of Agriculture: Wetlands Restoration Project
 

CCC did a Wetlands Restoration Project in Whiting, VT, which involved blocking off manmade channels (waterways) to restore the wetland to its original conditions, by installing ditch plugs.
 

The Elks Charities: Silver Towers Project
 

The Elks have a camp in Ripton, VT where kids with special needs are able to swim and ride and horses and many other fun things which they might not normally be able to do. CCC installed a much-needed complete new water disinfection, filtration, and storage system in the fall of 2009. CCC also rebuilt and paved the parking lot.
 

Porter Hospital: North Wing Addition
 

In 2004-2005 CCC was the contractor for all the groundwork on the new North Wing addition to the Middlebury hospital.
 

State of Vermont Department of Fish and Wildlife: Fishing Access Updates
 

CCC is currently resurfacing all the fishing accesses in the Rutland and Vergennes district. This involves bringing in new material and grading and rolling all accesses so the entrances are safe and smooth.
 

State of Vermont Agency of Transportation: District #3 State Garage
 

CCC completed a new sewer system and oil separator to attach the building to the Middlebury town sewer. The garage is located on Creek Rd, in Middlebury.
 

US Government: Road Resurfacing
 

CCC completed a road resurfacing job in the Texas Falls Recreation area, in Hancock, VT.

 

State of Vermont Agency of Transportation: Middlebury Airport Fence
 

CCC installed 6600 feet of chain link perimeter fence around the Middlebury State Airport on Rte 116 in East Middlebury.

 
 

From the small homeowner projects to the largest commercial projects, no job is out of our range!

 